Large Pharmaceutical Company Runs Lean With Informetric OEE Reports
Project Requirements:
- Generate a high-level report that summarizes data of downtime events, equipment performance, and product output
- Show a comparison identifying the amount of sellable product produced to the amount of sellable product that could have been produced in an optimal setting
- Determine typical operator response time per batch, over a specified duration of time
- Identify downtime between batches
Solution:
Informetric Systems InfoBatch
Results:
- Customer was able to provide management with an on-demand report that provided a detailed overview for each cycle and phase
- Batch product rates are calculated and compared to the ideal product rate
- Operator response times are identified, providing the opportunity to address potential bottlenecks
- Downtime calucations were automated, reducing customer time and effort spend on manual analysis
|
|
|